Project: 15 Savile Row
Location: London W1
Contract Value: £70,000.00
Duration: 16 weeks
The project was a design and build concept for the client, working for a Main Contractor. The project was delivered on time and within budget. The building was sub divided in to 4 floors which were self contained.
Click for further details |
 |
Project: Nigerian High Commission
Location: Fleet Street, London
Contract Value: £330,000.00
Duration: 20 Weeks
The project was consultant specified CAT A fit out of a seven storey office building, working for a Main Contractor. The project was delivered on time and within budget.
Click for further details |
 |
Project: Kaupthing Singer & Friedlander
Location: Dorking, Surrey
Contract Value: £204,000.00
Duration: 12 Weeks
The project was a design and build concept for the client, working for a Main Contractor. The project was delivered on time and within budget.
Click for further details |
 |
Project: Uncle Post Production
Location: London W1
Contract Value: £420,000.00
Duration: 9 Months
The project was a design and build concept for the client, working for a Main Contractor. The project was delivered on time and within budget.
Click for further details |
 |
Project: The Vintners Company
Location: London EC4
Contract Value: £50,000.00
Duration: 4 Weeks
A design, supply and installation project of a Daikin VRV heat recovery air conditioning system to replace the existing perimeter heating and cooling system. All pipe work had to be concealed in floor and wall voids. The fan coils were selected to fit within existing perimeter casings. The concept was a very difficult installation, working in an occupied office environment; delivered within time and on budget.
Click for further details |